3000t/d clinker dry process rotary kiln cement plant
SCOPE OF WORK
1.2.1Machinerysupply 1.2.1.1The scope of Machinery supply of this proposal for the 3000 t/d production lineis from the raw material crushing to the to the cementpacking and dispatching, which is divided into the following systems:
Department 1: Extraction of raw materials Section 1: Limestone Crushing & Conveying Section 2: Corrective Material Crushing & Conveying
Department 2: Preparation of raw materials Section 1: Limestone Preblending Storage Section 2: Corrective Material Preblending Storage Section 3: Raw Material Proportion Station
Department 3: Raw Meal Preparation Section 1: Raw Material Grinding and Exhaust-gas Dedusting Section 2: Homogenizing Silo & Kiln feeding System
Department 7: Fuel Coal System Section 1: Pulverized coal preparation
Department 8: Others Section 1: Compressed Air Station Section 2: CCR Section 3: LAB
The following auxiliary equipment and other equipment in the production line will be included:
Belt conveyors Elevators Air slides Screw conveyors Chain conveyors Apron conveyor Apron feeder Rotary feeder Dust collectors Ventilators and fans Damper & Valves Metal detector Magnetic separators Dosing and weighing equipment Weighing bridge Grinding media Refractory Insulation Sampling equipment Laboratory equipment Electrical Equipment And ≤10kv Power Transformer Motor control centers Field instrumentation DCS system Wire and Cable Plant Lighting Water Supplying and Drainage Non-standard Parts Two-Year Spare Parts