Cement Project 6000tpd Clinker Line

Customization:
Diamond Member Since 2009

Suppliers with verified business licenses

Manufacturer/Factory

Product Description

1.2 Scope of supply of Contractor
1.2. 1 Machinery supply
1.2. 1. 1 The scope of Machinery supply of this proposal is from the raw material crushing to
The cement packing and dispatching for cement production line which are divided
Into the following systems:
Department 1: Preparation of raw materials
Section 1: Limestone Crushing
Section 2: Limestone Preblending Storage & Proportioning
Section 3: Gypsum Crushing& Conveying
Section 4: Gypsum/corrective Preblending Storage& Conveying


Department 2: Raw Meal Preparation
Section 1: Raw Material Grinding
Section 2: Exhaust-gas Handling
Section 3: Raw Meal Homogenizing Silo & Kiln feeding System
Department 3: Clinker manufacture
Section 1: Preheater & Precalciner
Section 2: Kiln & Tertiary Air Duct
Section 3: Grate Cooler
Section 4: Clinker Storage & Conveying

Department 4: Cement manufacture


Section 1: Cement Proportioning Station
Section 2: Clinker Grinding System
Section 3: Cement Storing & Bulk Loading
Department 5: Cement Packing
Section 1: Cement Packing
Section 2: Cement Bag Loading
Department 6: Fuel Handling System
Section 1: Gas Treatment
Section 2: Gas Burning System
Department 7: Elecrical and control network
Section 1: Electrical rooms
Section 2: Control network

Department 8: Quality control
Section 2: CCR
Section 3: LAB
Department 9: Water treatment
Section 1: Water treatment
Section 2: Drainage and Sewage
Department 10: General Plant Service
Section 1: Compressed Air Station
Section 2: Weigh Bridge(s)
Section 3: Mechanical and Electrical Workshop
Section 4: Brick (refractory) storage

1.2. 1.2 The following auxiliary equipment and other equipment in Cement Project will
Be included:
Belt conveyor(long belt from limestone crusher to preblending is not
Include)
Bucket Elevator
Air slide
Screw conveyor
Chain conveyor
Apron conveyor
Apron feeder
Rotary feeder
Dust collector
Ventilator and fan

Metal detector
Magnetic separator
Dosing and weighing equipment
Weighing bridge
Refractory
Insulation
Sampling equipment
Laboratory equipment
Electrical Equipment
Motor control centers
Field instrumentation
DCS system
Wire and Cable
Water Supplying and Drainage
Emergency power generator
The chinese equipment will be made according to chinese standard, the third
Country equipment will be made according to third country's standard,


1.2. 2 Engineering
A) Basic engineering: Design and supply of basic engineering of China Cement
Project.
B) Detailed engineering: Design and Supply of detailed drawings for the civil
Works and equipment installation and site fabrication. The operation and
Maintenance instruction.
1.2. 3 Erection and Commissioning
Erection includes mechanical erection, Installation of electrical, instrumentation
And control systems,
Erection Scope is also included the Steel structure for preheater tower.
Commissioning and performance test are in the scope of Contractor.
Commissioning of the project will be carried out by Contractor's personnel and
The Employer's personnel, .

1.2. 4 Training
The Employer's engineering and operation staff will be provided with suitable
Training services. The objective of this training is to provide the Employer's
Personnel with sufficient knowledge and skill on the works.
A) Overseas training
Contractor will train the Employer's personnel in the Contractor's office and at