3.2×13m Ball Mill in Cement Production Line
Technical parameter and performance for cement mill
1,Specification:φ3.2×13m
2,Capacity:30t/h(feeding size≤ 25mm,moisture of material≤0.5%,feeding temperature ≤50ºC,mill air speed≥0.5m/s,Blaine≥350m2/kg)
Raw material proportion :Slag 65%Gypsum 5%Clinker 30%
3,Mill speed:18.4r/min
4,Grinding body loading capacity:about 120t(not include)
5,Main motor:(Chongqing Motor)
Type:YR1600-8/1430 Power:1600kW Speed:743r/min
Voltage: 6.6KV
6,Main reducer:(Chongqing gearbox)
Type:JDX1000 hard tooth surface
Input speed:740r/min Speed ratio i=7.15
7,Auxiliary motor:
Type:YEJ225M-8 Power:22kW Speed:740r/min
8,Auxiliary reducer:(Tailong)
Type:ZSY315-I Speed ratio:i=100 Input speed:740r/min
9,Cooling type:Water cooling
10,Lubrication type:Lubrication oil station(GYXZ-40A )
(1)Low pressure system
Flow rate:40L/min Oil supply pressure:0.4MPa
Oil supply temperature:40±3ºC Motor:Y100L-4 3kW
(2)High pressure system
Flow rate:2.5L/min Oil supply pressure:32Mpa Motor:Y112M-6 2.2kW
(3)Other performance
Oil tank volume:1m3 Filter precision:0.08mm Filter area:0.19m2
Cooling area:5m2 Cooling water consumption:3.6m3/h
Heater power:3kW×3 Working media:N22-N320